Water and Environment
Models of wastewater plants, waste handling and water networks, with process flow and tank structure as the subjects. Tanks are cut open so the inlet, aeration, settling and outlet zones can be read; networks are laid out in layers to explain burial depth and how the connections run.
固废处理环保科技产业园沙盘C-01 · 4:3 山水林田湖流域综合治理沙盘C-02 · 4:3 高浓度化工有机废水成套处理技术与装备工艺流程模型C-03 · 4:3 固废处理环保科技产业园沙盘C-04 · 4:3 固废处理环保科技产业园沙盘C-05 · 4:3 山水林田湖流域综合治理沙盘C-06 · 4:3
Order follows the process
Water models are laid out in process order: inlet, screening, grit removal, biological treatment, settling, disinfection. Each stage keeps its fixed place on the base, so one walk along the edge of the model reads both the flow and the plant layout.
Tanks and networks
Tanks are sectioned with walls, floor and equipment supports separated by level, and the aerators and scraper bridges modelled as recognisable small parts. The network is laid out as its own layer, pipe diameter and burial depth shown by height difference, with connections and inspection chambers built in.
Plates to follow
On-site photographs for this line are still being colour-corrected and cut out, and the plates will be added here shortly. The text describes delivered projects; sizes and lead times are quoted per job.

